Spackling... Finished

Image
Spackling finished... wainscoting will come up to a height of 42 inches so the bottom will be covered rather than painted. The weather is lousy enough today that I don't feel comfortable pulling all my expensive shop power tools out of the shed to start on finish carpentry for our half bath project. Instead, I decided to document where we are at in the project as of today. Waste plumbing is finished... flooring tile is finished... supply plumbing is roughed-in but still need to add three valves after the wainscoting is installed... electrical is finished... drywall is finished...  and now spackling is finished. My health has been poor over the past few days so I accomplished very little this week. I did, however, manage to get a coat of joint compound on the drywall each day. Since it is a very small room, that only required about 15 minutes of work each day. So, at least that has been accomplished this week.  Note:  I'm out of practice with my spackling...  What norm