Made Some Headway Today!
I actually accomplished quite a bit on the half bathroom today in the way of finish carpentry. I had hung the new custom door I built yesterday. Today I cut and installed the door stop... trimmed out both sides of the door... cut and installed a top rail for the wainscoting... added some architectural details... cut the wood needed for crown molding... and even masked off the new tile floor in preparation of painting.
There were a few plumbing fittings to assemble and I managed to assemble those today as well. I had two supply valve assemblies for the sink and one supply valve assembly for the toilet which needed to be put together. Since it was nice outdoors today, I managed to get those done as well.
I hope to get some staining and painting accomplished tomorrow. If that goes well, I will cut off the water supply so I can install the three valve assemblies that I assembled today.
Things are moving along and I'm happy report that I made some significant headway today!
Inside the half bathroom with the new door closed! |
Some little architectural details I decided to add at the last moment today. These details tie in this design with the living room fireplace mantle... |
The new bathroom door viewed from the hallway... |
Comments
Post a Comment