A Little More Progress
![Image](https://blogger.googleusercontent.com/img/b/R29vZ2xl/AVvXsEhRdahSd2xGb_r96ly3kIbGbTOsmHTPIcJDXNJaGfNR1_pO8xlUWXPqDxSYq-Nmg_pZA8u4zXBsJapVTHHwiosIgF1HS9Ij78d0vNHQbo6eojd4EXPppfcNv12JD5ttEktVH8vUj03n4-4g/s1600/OL177881+edited_smblog.jpg)
All the electrical works! Dimmer switch at left, fan delay timer at center, and GFCI outlet at right. I managed to get a little bit more accomplished on the half bath yesterday. That wore me out and I had some health issues later that night so I took another day off today for rest and recovery. Actually, I slept the entire day! I installed the subfloor as well as the underlayment. That was a fairly easy job. We now have another clean and level spot in the old house! Oh, and a solid spot! Once I get a primer for the self-adhesive tiles, I can finish the flooring. I have a couple of extra boxes of the tile flooring that we had installed in the hallway that we plan to continue on into this new half bath. A week or so ago, I had written that I installed all the wiring and tested all the fixtures and everything was fine... While everything worked fine (meaning I had wired everything correctly), I had a problem fitting these bulky electronic switches/timers/outlets into ...